Skip to Main Content

Case Studies

Case Studies

Our case studies represent real world applications showing how our HVAC rental equipment has solved our customers’ needs. These examples showcase our company’s broad range of capabilities including unique industry applications and demonstrating how our team successfully problem solved to overcome unusual challenges.

Hydroponics Facility Case Study

For over a year, TEMP-AIR provided two model PAC-50T4H 50-ton temporary industrial air conditioners at Urban Till, a Chicago-based hydroponics company. Hydroponics is the process of growing plants…

NFL Playoff Game Case Study

To prepare for the coldest Vikings football game in history, TEMP-AIR was hired to thaw out the frozen turf at TCF Bank Stadium in the days prior to the Vikings vs. Seahawks showdown. As the 3rd…

New University Classroom Case Study

An Oregon university undergoing a new classroom building construction project required precise temperature control to assist in keeping the project on schedule during the different construction phases.…

Cooling Tower Replacement Case Study

GE Aviation contracted CH2M Hill to replace their permanent closed loop cooling tower. During the replacement, TEMP-AIR supplied a temporary 270 ton closed loop trailer-mounted cooling tower for the…